Award history

List of awards

  • Japan Society of Civil Engineering Chubu Branch Technical Award (2019)
  • Ministry of Education, Culture, Sports, Science and Technology Award (2022)
  • Ministry of Land, Infrastructure, Transport and Tourism NETIS Registered CB-180024-A
  • Japanese Patent No. 6304901/No. 6501718

Feature

Features

*Excerpt from "Effect of Shot Peening on Fatigue Strength of Welded Joints"
(Japan Society of Civil Engineering, Heisei 28 National Conference Paper Presentation Excellent Speaker Award)

By hitting countless special steel balls (peening materials) on the steel surface at high speed and plastic deformation only near the surface, it is possible to give compressive residual stress to the surface layer.This technology improves resistance to fatigue cracks and stress corrosion cracking.In addition, the crystal on the surface is miniaturized to suppress the growth of cracks.
Furthermore, surface hardening prevents scratches from entering.It is a proven technology that has been commonly used in the automotive and aircraft industries to improve fatigue durability.

Improved durability

Added compressive residual stress

Improved fatigue durability

Miniaturization

Miniaturization of crystals

Reduce crack growth

Curing

Surface hardening

New cracks become harder to enter

Made the impossible possible
"Eco-Clean Hybrid Method"

It is possible to prevent the scattering of peening materials by constructing it simultaneously with the repainting work, and using scaffolding for blasting and scattering protection equipment in combination.
Circulating blast method®By combining the "recycling system" of peening materials, the recovery and reuse of peening materials is realized.
The grinding material for painting (steel grit) has been replaced with special steel ball for peening, so that shot peening can be performed even on existing bridges.
We have established on-site construction management methods and finished form management methods to ensure stable quality.

Flow

Future Repainting standard process

(01)

足場・防護設備設置

Protective equipment is installed around the scaffold to prevent the scattering of grinding materials and dust.
(Also used for shot peening)

(02)

Base adjustment degree 1 type

For the specified dust work, the person involved in the work performs the construction by the air line equipment.

(03)

Inspection of welds, etc.

Check for cracks.Repair of the occurrence was examined and shot peening was carried out in the non-occurrence part.

(04)

Peening treatment

Due to the injection by compressed air, work efficiency is good and construction in narrow areas is also possible.Proficiency is also unnecessary.

(05)

Form management

We have established a management method using a dedicated mold measuring device (coverage checker) to ensure stable quality.

(06)

2 Next blast

Anticorrosive substrate is applied within 4 hours.

(07)

Painting

Anticorrosive substrate is applied within 4 hours.

(08)

Completed

Undercoating, middlecoating and topcoating.

Shot peening works on existing steel bridges

(01)

平成25年度1号潮見東地区橋梁塗装工事
(Chubu Regional Development Bureau Hamamatsu River National Highway Office 2014.3~2015.1)

(02)

Heisei 26 fiscal year No. 41 Takayama tube steel bridge repair work
(Chubu Regional Development Bureau Takayama National Highway Office 2015.9~2016.2)t

(03)

Heisei 28 fiscal year No. 1 Concentric bridge bridge painting work
(Chubu Regional Development Bureau Hamamatsu River National Highway Office 2016.9~2017.6)

(04)

Heisei 28 fiscal year No. 23 Kitagashira Viaduct up painting repair work
(Chubu Regional Development Bureau Nagoya National Highway Office 2017.3~2018.3)

(05)

Heisei 30 fiscal year No. 1 Miike Bridge painting work
(Chubu Regional Development Bureau Hamamatsu River National Highway Office 2018.8~2019.6)

(06)

東名阪自動車道 津島高架橋塗替え塗装工事(平成30年度)
(Nakanihon Expressway Co., Ltd. Nagoya Branch Office 2019.2~2020.4)

(07)

橋梁維持工事(加家高架橋第3径間)
(Tokai City 2019.8~2020.2.)

(08)

Tomei Expressway (specific renewal, etc.) Floor plate replacement work between Susono IC and Numazu IC (Heisei 29 fiscal year)
(Nakanihon Expressway Co., Ltd. Tokyo Branch Office 2019.9~2020.12)

(09)

No. 23 Moral Viaduct down painting repair work
(Chubu Regional Development Bureau Nagoya National Highway Office 2019.10~2020.11)

(10)

Painting repair work in the Mikawa Area in the first year of the Reiwa Era
(Chubu Regional Development Bureau Nagoya National Highway Office 2020.1~2021.3)

(11)

橋梁維持工事(加家高架橋第6径間)
(Chubu Regional Development Bureau Shizuoka National Highway Office 2020.5~2021.3)

(12)

Painting work in the Fuji Maintenance pipe in the first year of the Reiwa era
(Chubu Regional Development Bureau Shizuoka National Highway Office 2020.5~2021.3)

(13)

橋梁維持工事(加家高架橋第6、7径間)
(Tokai City 2020.7~2021.2)

(14)

橋梁維持工事(加家高架橋第1径間)
(Tokai City 2020.9~2021.3)

(15)

Repainting of bridges under the jurisdiction of the Osaka Expressway Office (Part 2)
(West Japan Expressway Co., Ltd. Kansai Branch Office 2021.7)

(16)

Tomei Expressway (Specific renewal, etc.) Floor plate replacement work between Susono IC and Numazu IC (FY2019)
(Nakanihon Expressway Co., Ltd. Tokyo Branch Office 2021.2~ under construction)

(17)

Tomei Expressway (specific renewal, etc.) Floor plate replacement work between Susono IC and Numazu IC (FY2020)
(Nakanihon Expressway Co., Ltd. Tokyo Branch Office 2022.1~ under construction)

(18)

Reiwa 4 fiscal year Quiet maintenance pipe painting work
(Chubu Regional Development Bureau Shizuoka National Highway Office 2022.9~2023.3)