Page top

Comprehensive

Comprehensive

What kind of customer base do you have?

We have received many direct orders for public works from the Ministry of Land, Infrastructure, Transport and Tourism, local governments, and NEXCO companies.

Please tell us about the construction results you have worked on so far.

"Construction results"You can see the main construction sites from here.

Can I request a quote?

"Inquiry Form"orPhone (052-604-107)にて承ります。迅速な対応を心がけておりますが、お急ぎの方はお電話にて直接お問い合わせください。

Please tell us about the job information.

We have a separate recruitment site.The details arerecruitment of new graduatesor"Mid-career recruitment"Please see below.

Is there anything you do as a social contribution?

We aim to be a company that contributes to a sustainable society based on the spirit of "Changing the world by reducing waste."
1.Initiatives for a Low-Carbon Society
2.Initiatives for a Circular Society
3.Symbiosis with local Communities
We are engaged in a wide range of activities, including the development of new construction methods, the review of the construction environment, local cleaning activities, and special classes at schools.3
The details areCSRPlease see below.

Please tell us about your efforts to achieve the SDGs by 2030.

We, Yamada Infrastructure Technos Co., Ltd., agree with the SDGs (Sustainable Development Goals) and are working to achieve the SDGs by 2030 to realize the following sustainable societyWe will continue to strive to improve the quality of our products and services.
1.Under the mission of "Solving the shortage of engineers", we actively engage in educational activities and contribute to the sustainable economic growth of Japan's infrastructure.It's a good idea.
2.We will support equal and rewarding workplaces and strive to achieve a diverse society.
3.循環式ブラスト工法®︎を普及させ、地球環境の保全に貢献します。
4.We will enhance our partnerships and promote the SDGs.

Questions about the solution

To what extent can we perform bridge repair work?

It is possible to perform consistently from repair to finish painting.

Circulating blast method®Where can I apply for public works?

It can be applied as a blasting method used for base adjustment in steel structures that require anti-corrosion measures, including steel bridges.
If the construction site is more than 400m away from the blasting machine, it cannot be applied to the place where the water and the treated surface are wet.

Circulating blast method®Please tell us about the conditions that can be applied.

As with the new technology, the treated surface works in a dry state.It is necessary to treat the working range with a sheet, etc. because the peeled paint film debris will scatter.For work on the road, non-metallic grinding materials can also be used to prevent the occurrence of rust.

What is the range of technology available?

It is possible to cope with 47 prefectures.Please feel free to contact us first.